Bathroom Renovation #1
The next big project is the bathroom. It's going to be a full gut and remodel. And it's going to take much longer than I plan. Most of the first days are filled with demolition. Removing the upper half the glass tile, which requires smashing the tile since it uses thick cement type mortar. This is difficult and causes lots of little cuts from the flying glass. Next we begin tear out the window and begin ripping off some of the drywall.
After removing more of the drywall down to the middle line we are able to really see the window rough opening. Once we by the appropriate size vinyl sliding window by Jeld-Wen, we have to alter the rough opening slightly to make it a tight fit. Then we use lots of caulk to seal the opening and make it water tight.