Thankfully Jen and Dana come over again to help out. I task them to pain the newly purchased crown moulding for my bedroom so it can dry in time for hanging while we still have the nail gun. I set them up in the garage next to our cabinet building station.

We build the 12" base cabinet for between the range/oven and the dishwasher. This will be the easiest cabinet install by far and we figure easy is a good place to start. We also build the 18" base cabinet for the other side of the range/oven next to the wall. The building is a pretty simple process starting with a cam system similar to Ikea products. In addition we use some wood glue and the nail gun with finishing nails to hold everything together. Using our counter height (34.5") two-by-fours as support we remove the previous cabinets via the sawzall and some "just pull"-ing. Sliding the two finished cabinet frames into place, we are well on our way! The final touches for these cabinets is to build and install the drawers and doors.